- Home
- Government
- Boards & Commissions
- Planning Board
- Virtual Planning Board Meetings
- Virtual Planning Board Documents
Virtual Planning Board Documents
Documents for the Virtual Planning Board Meetings can be seen below.
As required, documents will be available for public viewing at least 10 days before the hearing.
Documents are organized by Planning Board Case Number. For quick reference, please see the below list to determine the correct Planning Board Cases Number. For questions, please contact Board Secretary, Frances Boardman at boardmanf@rosenet.org or via phone at 973-583-3060.
Agendas and Minutes
Planning Board Calendar
Quick Case Number Search
Only upcoming/active applications are listed
|
|
Upcoming/Active Applications
P 21-005 - 132 Ridgedale Avenue
Documents received 5/5/2022
Revised documents received 6/10/2022
Documents Received 6/13/2022
P 21-006 - 3 Central Avenue
- 1210201.DrainageReport
- 1210201.Survey
- 1210201-SITE PLAN SET
- 210809_66 MAIN LLC_ARCH PLAN SET
- 220302_3 Central Ave_REV PER COMPLETENESS COMMENTS_220124
- 3 Central Appl Part II
- 3 Central Application
- 3 Central Ave Arch Se1
- 3 Central MEC rep
- 3 Central Police rep
- 66-68 Main 3 Central MEC comments
- 66MainStLLC_Oct4_2021_Optimize
- HPC TCC review 3 Central (004)
- Shade Tree Report - P-21-006 - 3 Central Avenue
- Technical Review 1_04.19-2022
- Technical Review 1_04.19-2022 Harrington
- Technical Review for TCC_09.30.2021
- Traffic Safety TCC memorandum 9.16.2021
Documents Received 9/29/2022
- 1210201.DrainageReport
- 1210201.Survey
- 2022-08-19 Traffic Statement (002)
- 2022-09-19 Crash Analysis Memo
- 3 - Central Photo Exhibit Iannarone
- 3 Central Appl Part II
- 3 Central Application
- 3 Central Ave Arch Se1
- 3 Central MEC rep
- 3 Central -SITE PLAN SET
- 66-68 Main 3 Central MEC comments
- 66MainStLLC_Oct4_2021_Optimize
- Architectural Plans - 3 Central Ave
- Design Guidelines for downtown commercial buildings
- FINAL 9-16-22 Memo HPC to Pl Bd Advisory Report for 3-5 Central Ave Applications(6294618.1)
- HPC TCC review 3 Central (004)
- Madison Engineer review memo 4-19-22
- Madison Police Dept 9-13-21
- Pedestrian detour plan
- Shade Tree Report - P-21-006 - 3 Central Avenue
- Signed Resolution re Central Ave
- SITE PLAN SET - 3 Central Ave
- Technical Review for TCC_09.30.2021
- Traffic Safety TCC memorandum 9.16.2021
Exhibit A-1 (Presented 10/18/2022)
Revised Site Plans (Received 10/26/2022)
Documents Received 11/23/2022
Exhibit Received 12/6/2020
Exhibits Received 1/5/2023
Exhibit Received 1/17/2023
P 22-001 - 286-294 Main Street
- Back Right
- behind right building
- Front left buildings
- Front right buildings
- Front Right wide
- garages
- IMG_5086
- Left building parking
- Madison Honda Light
- Madison Mall- Application Pkg
- Madison Mall- Architectural 3-7-22
- Madison Mall- BT Survey 4-21-20
- Madison Mall- Site Plan 2-25-22
- Madison Mall- SWM Report 10-21
- Madison Mall- TIS 6-16-22
- Madison Mall- Topo Survey 6-17-21
- secondary lawn looking towards back
- secondary lawn looking towards Madison Ave
P 22-004 - 5 Central Avenue
- 1220114.DrainageReport
- 1220114.DrainageReport
- 1220114.Title-Topo Survey-Survey
- 1220114.Title-Topo Survey-Survey
- 5 Central MEC comments
- 5 Central MEC comments
- Blicksten Report for completeness
- Blicksten Report for completeness
- Final Renderings small file
- Final Renderings small file
- Google earth 3D
- Google earth 3D
- HPC Memorandum_July 11 2022
- HPC Memorandum_July 11 2022
- Ledan app-1
- Ledan app-1
- Ledan Holdings Photos
- Ledan Holdings Photos
- Ledan Holdings Photos
- P-22-004_5 Central Ave._
- P-22-004_5 Central Ave._
- Shade Study August 22
- Shade Study Feb 22
- Site-plans-2022-05-20-1220114
- Technical Review for TCC_Harrington_07.13.2022
Documents Received 9/29/2022
- 01 PEDESTRIAN DETOUR PLAN
- 2022-08-19 Traffic Statement
- 2022-09-19 Crash Analysis Memo
- 5 Central - Photo Exhibit Ledan Holdings
- 5 Central 1220114.DrainageReport - Ledan Holdings
- 5 Central 1220114.Title-Topo Survey-Survey
- 5 Central Avenue Architectural Set-9-30-22
- 5 Central HPC Memorandum_July 11 2022
- 5 Central MEC comments
- 5 Central Shade Tree Mgmt Bd P-22-004_5 Central Ave._
- 5 Central Site-plans-2022-05-20-1220114
- 5 Central Technical Review for TCC_Harrington_07.13.2022
- 5CentralAve_revSept28_2022_Optimize
- Design Guidelines for downtown commercial buildings
- FINAL 9-16-22 Memo HPC to Pl Bd Advisory Report for 3-5 Central Ave Applications(6294618.1)
- Final Renderings small file
- Google earth 3D
- Ledan appl part I
- Ledan Appl part II
- Shade Study August 22
- Shade Study Feb 22
- Signed Resolution re Central Ave
Exhibit 1-A (Presented 10/18/2022)
Revised Site Plans (Received 10/26/2022)
Exhibit Received 12/6/2022
Exhibits Received 1/5/2023
Exhibit Received 1/17/2023
P 22-005 - Madison BOE (CAS & KRS)
Completed Applications
P15-006A - 17 Greenwood Avenue
CASE NO. P. 19-005
Preliminary and Final Site Plan with Variances
16 Waverly Place, LLC
16 Waverly Place
Block: 2702, Lot: 28
- Site Plan Application
- Addendum to Site Plan Application
- Boundary Survey
- Photos of Site
- Site Plan Cover Sheet Revised (11/19)
- Site Plan Existing Conditions Revised (11/19)
- Proposed Site Plan Revised (11/19)
- Construction Details Revised (11/19)
- Architectural Original Plan (4/19)
- Architectural Plan Revised Plan (8/19)
- Architectural Plan Revised Plan (2/20)
- Exhibit A-1
- Exhibit A-2
- Exhibit A-3
- Exhibit A-4
- Exhibit A-5
- Traffic Impact Statement
P 19-008A - 44 Brooklake Road
- 44BROOKLAKE-SUBDIVISION-ALTERNATE-072420 (MODIFICATION) (01495455x7AE8E)
- BROOKLAKE - APPLICATION (01510404x7AE8E)
- BROOKLAKE - CERT IN LIEU OF OATH (01510406x7AE8E)
- BROOKLAKE - CHECKLIST A (01510407x7AE8E)
- BROOKLAKE - CHECKLIST C (01510410x7AE8E)
- BROOKLAKE - CHECKLIST D (01510411x7AE8E)
- BROOKLAKE - COVER LETTER (01510403x7AE8E)
- BROOKLAKE - PERMISSION TO ENTER (01510405x7AE8E)
- BROOKLAKE - RIDER TO APPLICATION (01510409x7AE8E)
- BROOKLAKE - TAX CERT (01510412x7AE8E)
- BROOKLAKE - UTILITIES CURRENT STATEMENT (01510413x7AE8E)
- BROOKLAKE APPROVAL RESOLUTION 2-5-20 (01495456x7AE8E)
P 20-001 234 Main Street
- Application
- APPLICATION - MPB (01480113x7AE8E)
- BETZ MPB APP - 200FT LIST (01480131x7AE8E)
- BETZ MPB APP - ACCOUNTS IN GOOD STANDING (01480128x7AE8E)
- BETZ MPB APP - CERT IN LIEU OF OATH (01480116x7AE8E)
- BETZ MPB APP - CHECKLIST A (01480120x7AE8E)
- BETZ MPB APP - CHECKLIST C (01480121x7AE8E)
- BETZ MPB APP - CHECKLIST D (01480122x7AE8E)
- BETZ MPB APP - ESCROW AGREEMENT (01480124x7AE8E)
- BETZ MPB APP - FEES AND ESCROWS CALCULATION (01480126x7AE8E)
- BETZ MPB APP - OPRA RESPONSE (01480123x7AE8E)
- BETZ MPB APP - PERMISSION TO ENTER (01480118x7AE8E)
- BETZ MPB APP - PLANNERS REPORT (01480133x7AE8E)
- BETZ MPB APP - RIDER TO APPLICATION (01480119x7AE8E)
- BETZ MPB APP - SITE PLAN AND SIGN DETAIL (1 OF 1) (01480419x7AE8E)
- BETZ MPB APP - TAX CERT (01480130x7AE8E)
- BETZ MPB APP - TCC MINUTES (01480132x7AE8E)
- BETZ PD APP - OWNERS CONSENT (01480114x7AE8E)
- Site Plan
CASE NO. P. 20-002
Preliminary and Final Site Plan with Variances
Fairleigh Dickinson University
285 Madison Avenue
Block: 101, Lot: 6
- Application Documents
- Cover Letter #1
- Cover Letter #2
- Application
- Owner’s Consent to Application
- Applicant’s Disclosure Statement
- Technical Review Escrow Agreement
- Permission to Enter Applicants Property
- W9 Form
- Project Narrative
- Variance Request Chart
- Zoning Requirements
- Checklist A
- Addendum to Checklist A
- Checklist C
- Checklist D
- Checklist E
- Requests for Checklist Submission Waivers
- Tax and Assessment Payment Report
- Draft Public Notice
- 200’ List - Madison
- 200’ List - Morris Township
- 200’ List - Florham Park
- 200’ List - Harding Township
- Sewer Water
- Memorializing Resolution Case NOP 18-003A
- Witness List
- Morris County Planning Board Application
- Photographs
- Preliminary Environmental Checklist
- Deed Restrictions
- Professional Opinion Letter
- Florham Campus Athletics Facilities Parking Management Procedures
- FDU Devils 2018 Data for Spring Baseball Attendance
- Survey 1
- Survey 2
- Survey 3
- Survey 4
- Survey 5
- Plan Drawings
- Reports
- Pre-Marked Exhibits
P 20-003 4 Community Place
- Architectural Plans - Cover Page
- Architectural Plans - Exterior Elevations
- Architectural Plans - Exterior Elevations 2
- Architectural Plans - 1st Floor Plan
- Architectural Plans - 2nd Floor Plan
- Architectural Plans - 3rd Floor Plan
- Boundary and Topographic Survey
- Planning Board Application Materials
- Site Plan (1 of 10) - Cover Page
- Site Plan (2 of 10) - General Notes and Zoning
- Site Plan (3 of 10) - Existing Conditions and Demolition Plan
- Site Plan (4 of 10) - Site Layout and Circulation Plan
- Site Plan (5 of 10) - Grading and Utility Plan
- Site Plan (6 of 10) - Landscaping and Lighting Plan
- Site Plan (7 of 10) - Soil Erosion and Sediment Control Plan
- Site Plan (8 of 10) - Soil Erosion Notes
- Site Plan (9 of 10) - Construction Details
- Site Plan (10 of 10) - Construction Details
- Stormwater Management Report (with appendices)
- Traffic Impact Statement
Exhibits
Updated Documents Received October 12, 2020
- Architectural Plans - Cover Page (revised 2020.10.06)
- Architectural Plans - 1st Floor Plan (revised 2020.10.06)
- Architectural Plans - Alternate 1st Floor Plan (dated 2020.10.06)
- Architectural Plans - 2nd Floor Plan (revised 2020.10.06)
- Architectural Plans - 3rd Floor Plan (revised 2020.10.06)
- Architectural Plans - Exterior Elevations (revised 2020.10.06)
- Architectural Plans - Alternate Exterior Elevations (dated 2020.10.06)
- Architectural Plans - Exterior Elevations 2 (revised 2020.10.06)
- Architectural Plans - Roof Plan (revised 2020.10.06)
- Architectural Plans - Unit Plans (dated 2020.10.06)
- Streetscape Plan Exhibit
- Site Plan (1 of 11) - Cover Page (revised 2020.10.09)
- Site Plan (2 of 11) - General Notes and Zoning (revised 2020.10.09)
- Site Plan (3 of 11) - Existing Conditions and Demolition Plan (revised 2020.10.09)
- Site Plan (4 of 11) - Site Layout and Circulation Plan (revised 2020.10.09)
- Site Plan (5 of 11) - Grading and Utility Plan (revised 2020.10.09)
- Site Plan (6 of 11) - Landscaping Plan (revised 2020.10.09)
- Site Plan (7 of 11) - Lighting Plan (revised 2020.10.09)
- Site Plan (8 of 11) - Soil Erosion and Sediment Control Plan (revised 2020.10.09)
- Site Plan (9 of 11) - Soil Erosion Notes (revised 2020.10.09)
- Site Plan (10 of 11) - Construction Details (revised 2020.10.09)
- Site Plan (11 of 11) - Construction Details (revised 2020.10.09)
- Letter from Blackbird Architects dated 10.06.2020
- Exhibit - Proposed Fence Details - Park Valley
- Exhibit - Updated Streetscape Plan - Park Valley
- Exhibit - Alternate Architectural Rendering - Park Valley
P 21-002 - 120 Madison Avenue
- 01 COVER SHEET
- 01-110379-04 ALTA LOT 21 2020-11-12
- 02 AERIAL MAP
- 03 DEMOLITION AND TREE MANAGEMENT PLAN
- 04 SITE PLAN
- 05 GRADING PLAN
- 06 DRAINAGE AND UTILITY PLAN
- 07 LANDSCAPE PLAN
- 08 LIGHTING PLAN
- 09 SOIL EROSION AND SEDIMENT CONTROL PLAN
- 10 SOIL MANAGEMENT AND PREPARATION PLAN
- 11 SOIL EROSION NOTES AND DETAILS
- 12 CONSTRUCTION DETAILS
- 120 Madison - Legal Notice For PB virtual hearing 5-17-21 FINAL
- 120 Madison - Property Owner List 5-11-21
- 120 Madison - Tax and Assessment Payment Report
- 120 Madison - Tax Assessor Preliminary Review 3-25-21
- 120 Madison - TCC Minutes 04.13.2021 120 Madison Avenue (Autosaved)
- 120 Madison -HC TCC review 120 Madison Av 4-9-21
- 13 CONSTRUCTION DETAILS
- 14 CONSTRUCTION DETAILS
- 15 CONSTRUCTION DETAILS
- 16 CONSTRUCTION DETAILS
- 17 VEHICLE CIRCULATION PLAN (SU-30)
- 18 VEHICLE CIRCULATION PLAN (FIRE TRUCK)
- 20107-PB - Architectural Set
- 2020-11-01 Will Serve (electric,water,sewer)
- 2020-11-03 PSEG Gas Will Serve Letter
- 2021-03 EIA - FINAL
- 2021-03 Photo Location Report
- 2021-03 Statement of Outside Agency Approvals Required
- 2021-03 Statement of Reason for Application
- 2021-03-05 Checklist A - General Requirements
- 2021-03-05 Checklist C - Prelim. Site Plan Approval
- 2021-03-05 Checklist D - Final Site Plan Approval
- 2021-03-09 POL - Madison
- 2021-03-18 OPRA Response
- 2021-04 Drainage Statement with Earth Report
- 2021-04-06 Planner Review Letter 1
- 2021-04-07 Madison construction plant list
- 2021-04-07 MEC Review Letter 1
- 2021-04-08 Engineer Review Letter 1
- 2021-04-09 Traffic Review 1
- 2021-04-12 Shade Tree Review 1
- 2021-04-21 Revised Indiana Bat Habitat Report
- 2021-04-29 Planner Review Letter 2
- 2021-04-30 County Letter of Exemption
- 2021-05 Env. Checklist - Signed
- 2021-05 List of Witnesses
- 2021-05 Property Survey
- 2021-05-03 Planning Board Application Packet - Signed
- 2021-05-04 Borough Resubmission Letter
- 2021-05-04 TIS Rev 1
- 2021-05-06 SCD Review Letter
- Technical review 1_May 25.2021
- Transmittal - 00012
- Traffic Report No. 2
Renderings
- 120 Madison Ave - Rendering used at TCC 10a
- 120 Madison Ave - Rendering used at TCC 11a
- 120 Madison Ave - Rendering used at TCC 12a
- 120 Madison Ave - Rendering used at TCC 13a
- 120 Madison Ave - Rendering used at TCC 14a
- 120 Madison Ave - Rendering used at TCC 1a
- 120 Madison Ave - Rendering used at TCC 2a
- 120 Madison Ave - Rendering used at TCC 3a
- 120 Madison Ave - Rendering used at TCC 4a
- 120 Madison Ave - Rendering used at TCC 6a
- 120 Madison Ave - Rendering used at TCC 7a
- 120 Madison Ave - Rendering used at TCC 8a
- 120 Madison Ave - Rendering used at TCC 9a
Exhibits - Received May 25, 2021
- 2021-06-01 Combined Hearing Exhibits
- A-1 - 3D Rendering (Intro)
- A-10 - 3D Rendering Aerial
- A-11 - 3D Rendering Madison Streetview
- A-12 - 3D Rendering Madison Streetview
- A-13 - 3D Rendering Madison Driveway
- A-14 - 3D Rendering Madison Driveway
- A-15 - 3D Rendering Madison Ave
- A-16 - 3D Rendering Madison Ave
- A-17 - 3D Rendering Intersection
- A-18 - 3D Rendering Intersection
- A-19 - 3D Rendering Vinal Streetview
- A-2 - 3D Rendering Aerial
- A-20 - 3D Rendering Vinal Streetview
- A-21 - 3D Rendering Vinal Driveway
- A-22 - 3D Rendering Vinal Driveway
- A-23 - 3D Rendering Building Entrance
- A-24 - 3D Rendering Building Entrance
- A-25 - 3D Rendering Building
- A-26 - 3D Rendering Building
- A-27 - First Floor Plan
- A-28 - Second Floor Plan
- A-29 - Basement Floor Plan
- A-3 - Aerial Map Exhibit
- A-30 - Roof Floor Plan
- A-31 - Northeast Elevation
- A-32 - Northwest Elevation
- A-33 - Southwest Elevation
- A-34 - Southeast Elevation
- A-4 - Property Survey
- A-5 - Existing Site Photos Exhibit
- A-6 - Site Plan Rendering
- A-7 - 3D Rendering Aerial
- A-8 - 3D Rendering Aerial
- A-9 - 3D Rendering Aerial
Submission Documents - Received June 4, 2021
Other Documents
Objectors Exhibits
- Lights - Drew U parking lot 3
- Madison Ave - School bus
- Lights - Drew U parking lot 4
- Lights - Drew U parking lot 2
- Photo Exhibit_Basking Ridge_Union
- Lights - Drew U parking lot 7
- Madison Ave - Trash day 2
- Lights - Drew U parking lot 6
- Lights - Drew U parking lot 1
- Aerial Map_Madison
- Madison Ave - Trash day 1
- View from 3 Ross Ct Kitchen window
- View from 3 Ross Ct (2) Hinge
- View from 3 Ross Ct (1) Hinge
- Lights - Drew U parking lot 5
- klein Photo 3
- Klein Photo 1
- klein Photo 2
P 21-004 - 18 Madison Avenue
Documents received 11/24/2021
P 21-007 - 28 Walnut Street & Community Place
- 2021-12-21 Site Plans
- 2021-12-22 Traffic Supplement
- 22-0125 - Madison Townhomes - Planning Board Submission Set
- Env report and checklist orignal
- Front
- Madison Updated Environmental Checklist 10-1-21
- RPA Morris Cty appr
- RPM Application
- RPM PHOTOS
- RPM survey lot 1.01
- RPM Survey lot 42
- RPM Title and OPRA
- RPM traffic rpt 9-14-21
- RPM_Walnut_CPlace_January18_22 - Planners report
- Shade Tree P-21-007 -28 Walnut and Community Place
- Side - Northwest
- Signed Survey
- Signed Survey 2
- Technical Review 1_djh 01.19.2022 - Engineers report
- Traffic - Borough Consultant report 1-24-22
- Updated Enviromental Impact Statement